Buying a new build in Texas: two contracts, and the words that decide when it is done

A new build is not a resale with new paint. Texas has two separate contract forms for it — the New Home Contract (Incomplete Construction), TREC No. 23-18, and the New Home Contract (Completed Construction), TREC No. 24-18, both cited here at revision 11-07-2022 — and both carry the same warning across the top of the first page: "Not For Use For Condominium Transactions or Closings Prior to Completion of Construction."
Which one you sign turns on a fact, not a preference. If the home is not finished when you sign, the construction contract is the form; if it is finished and you are buying it standing up, the completed-construction form is. Both are promulgated by the Texas Real Estate Commission and printed with that commission's approval.
This page describes what those forms commit the seller to, in their own words. It is not legal advice, and it is not a claim about what any particular builder hands you: if your purchase uses one of these forms, here is what is in it, and if you are handed a builder's own contract, these are the clauses to look for in it.
The countdown starts before the first brick
Both forms open the same way a resale does. Within 3 days after the effective date, the buyer delivers the earnest money and the option fee to the escrow agent, and the termination option — the option period — runs from the effective date for the number of days written into the blank. If you have read The option period and earnest money in a Texas contract, you already know that clock; the new-build forms do not change it.
What the seller is promising to build, and to what standard
Under the incomplete-construction form, the promise is defined by a document you should read before you sign it. The contract defines "Construction Documents" as the plans and specifications, finish-out schedules and change orders, and requires the seller to complete all improvements "with due diligence in accordance with the Construction Documents".
The line items you are paying for beyond the base price are governed by the same document, and the form caps your choices by the seller's own catalogue: "If the Construction Documents permit selections by Buyer, Buyer's selections will conform to Seller's normal standards as set out in the Construction Documents" — or, in the alternative, at a price agreed in writing. Read the part that says the seller "may substitute materials, equipment and appliances of comparable quality for those specified in the Construction Documents". "Comparable" is the word to be comfortable with before you sign.
The sentence that decides when the home is finished
The date in the completion paragraph is the one that decides how the deal ends, and the form defines it narrowly: ready for occupancy in accordance with the Construction Documents "upon the final inspection and approval by all applicable governmental authorities and any lender" — the Substantial Completion Date. The seller must commence construction no later than the stated number of days after the effective date, and the form allows for delays — force majeure, delays from buyer changes, and so on. Then it closes the door: "in no event may the time for substantial completion extend beyond the Closing Date."
That is a real constraint, so it needs a real answer to one question: what happens to your lease, your rate lock and your moving plan if the home is not ready on the day the contract says you close? The form's own structure is that the closing date is the outer wall. Ask your lender and your title company what they need before the closing can happen anyway — see What happens at a San Antonio closing.
The survey cannot be done early
A new-build survey has a timing rule a resale does not. Under the incomplete-construction form, "The survey must be made after the Substantial Completion Date by a registered professional land surveyor acceptable to the Title Company and Buyer's lender(s)." There is no shortcut: the plat of a lot with no finished house on it is not the survey the title company wants, and the survey is what the title policy's legal description gets checked against. Ordering it late is a closing-date risk; ordering it before the house is finished is a wasted fee.
Inspections, warranties, and what transfers at closing
You still get to inspect. The access paragraph in both forms lets the buyer and the buyer's agents onto the property at reasonable times, and lets the buyer have it inspected by "inspectors selected by Buyer and licensed by TREC or otherwise permitted by law to make inspections". On a completed-construction purchase the same paragraph adds the utilities obligation: the seller, at the seller's expense, keeps them on while the contract is in effect. A new home is not an inspection-free home.
Express warranties are narrow; manufacturer warranties are assigned. The incomplete-construction form says: "Except as expressly set forth in this contract, a separate writing, or provided by law, Seller makes no other express warranties. Seller shall assign to Buyer at closing all assignable manufacturer warranties." The completed-construction form carries the same sentence, and its repairs-and-improvements paragraph requires the seller to assign "any transferable warranties with respect to the Work" at closing. That is why the appliance and shingle paperwork matters: after closing, the maker's warranty is what you hold.
What this page will not do
It will not tell you whether a new build is a good buy, and it quotes no price, no upgrade cost, no builder incentive and no completion timeline, because none of those is a published fact — they are terms of a specific contract on a specific lot. It does not claim that every builder uses a TREC form, and it does not rank builders: no authority publishes that, and a page that graded them would be printing an opinion as a fact. It is not legal advice, and the forms themselves say a broker or sales agent may not give it.
The Find My Ideal Home matcher is the other half of this decision: you state what matters — price ceiling, property type, condition, the must-haves — and it scores the brief only from the answers you gave, flags an unmet must-have instead of averaging it away, and holds no listing and no valuation. Decide first whether "move-in ready this spring" or "finished to my choices next year" is the must-have. The contract above is much easier to read once you know which one you are buying.
Where to go next
- Writing a house wish list — put the condition you will accept in the brief before the builder conversation.
- The option period and earnest money in a Texas contract — the paragraph both new-home forms share, and the three-day rule inside it.
- What happens at a San Antonio closing — the title work and the money that has to be ready before the closing date arrives.
- Find My Ideal Home.
Tool
Find My Ideal Home
What this is. A place to write down what you actually want, sort it into what is non-negotiable and what is merely nice, and see where your own answers pull against each other.
What it is not. It is not a search engine. We hold no listings, no addresses and no prices, we do not know what is for sale, and it recommends no property. Every line it produces is a preference you stated or a box you ticked.
Your brief
You haven't told us anything to score yet
Write down one preference — a bedroom count, a ceiling, the outdoor space you need — and the questions about it appear, with the flags your own answers raise and the trade-offs between them. Nothing is scored until you answer a question, and a preference you leave unanswered is never counted as a miss.
Once you've written down at least one preference, you can save it, email it, or ask an expert about it.
